NHR 9300 vs NHR 9200 vs Mi-BEAM Power Rack  
(Figure — NHR 9300 vs. NHR 9200 vs. Mi-BEAM Power Rack)

The NHR 9200/9300 has supported high-power battery and electrification testing across automotive, aerospace, energy storage and other industrial applications but test requirements have evolved and so must the equipment that supports them.

The retirement of all remaining NHR products was publicly announced on September 8, 2025, with standard service for the NHR 9200/9300 ending December 31, 2026. For laboratories built around these systems, that raises one important question, what platform will support the next generation of high-power DC testing?

For organizations beginning that transition, the AMETEK Programmable Power Mi-BEAM Power Rack provides a modern, compact, modular alternative for many of the same high-power applications, including battery testing and simulation, electric powertrain development, energy storage and other bidirectional DC applications. Further, because the Mi-BEAM utilizes TCP/IP and SCPI protocols, the integration with existing systems is that much simpler, meaning no additional software layers are required.

More Than a Replacement

Rather than replacing one fixed system with another, Mi-BEAM creates an opportunity to improve power density, scalability, serviceability, and long-term flexibility.

Instead of sizing a system around a fixed 100 kW cabinet, the Mi-BEAM Power Rack uses modular 37.5 kW power building blocks. Each 42U rack supports up to seven Mi-BEAMs for 262.5 kW per rack, with multiple racks configurable for systems up to 8.6 MW. Individual units can also be isolated and replaced, simplifying service and enabling spare-module strategies.

With configurations from 80 V to 2,000 V and up to ±7,000 A per rack, Mi-BEAM supports applications ranging from high-current, low-voltage testing to emerging high-voltage architectures.

Native TCP/IP, SCPI, CAN bus, and GPIB controls help simplify integration with existing test environments, including platforms such as Enerchron and LabVIEW.


Start Planning the Transition

For organizations planning the next generation of high-power testing, the Mi-BEAM Power Rack provides a scalable path forward. Plan the next system around future power, voltage, current, integration, and service requirements. Build for future test requirements with a system that integrates with the existing environment and is manufactured in the USA.

Specification NHR 9200 NHR 9300 Mi-BEAM Power Rack
Dimensions Standalone cabinet (72 × 28 × 39 in; H × W × D); approximately 7.6 sq. ft. Standalone cabinet (78 × 28 × 39 in; H × W × D); approximately 7.6 sq. ft. Modular 42U rack (83.25 × 24 × 42 in; H × W × D); approximately 7 sq. ft.
Power per Cabinet/Rack 36 kW per cabinet (asymmetric charge/discharge limits) 100 kW per cabinet Up to 262.5 kW per rack
Maximum System Power Up to 432 kW Up to 2.4 MW Up to 8.6 MW*
Voltage Options 40/120/600 V ranges 600/1200 V ranges 80/400/600/800/1200/1500/2000 V
Maximum Current ±40/120/600 A ranges ±333 A per cabinet (600V)
±166 A per cabinet (1200V)
Up to ±7,000 A per rack, configuration dependent
Operation Bidirectional source/load Bidirectional source/load Bidirectional source/load
Regenerative Yes; >87% typical Yes; >95% typical Yes; >95% typical
Operating States Charge/discharge, load, battery emulation Charge/discharge, load, battery emulation Battery simulation, charge/discharge testing, load
Operating Modes CV, CC, CP, Series Resistance CV, CC, CP, Series Resistance CV, CC, Series Resistance, CV/CC, CC/CV, CV/CP, CC/CP, CP/CC
Transient Specifications Voltage Regulation: 20ms
Current Regulation: 1ms
Voltage Regulation: 20ms
Current Regulation: 1ms
Voltage Regulation: 10ms
Current Regulation: 0.5ms
Control Touchscreen, LAN, LabVIEW drivers, IVI drivers, SCPI Touchscreen, LAN, LabVIEW drivers, IVI drivers, SCPI Touchscreen, LAN, CAN, USB, RS-232C, isolated analog programming and monitoring, SCPI, LabVIEW drivers, IVI-C drivers, IVI-COM drivers, and optional GPIB
Software Enerchron Test Executive Enerchron Test Executive Battery application, virtual panels
Expansion Parallel up to 432 kW Parallel up to 2.4 MW Parallel operation up to 8.6 MW
Safety / Compliance Input AC isolation, output UUT isolation, OV, OC, OP, OTP, EPO, and rear-door interlock Input AC isolation, output UUT isolation, OV, OC, OP, OTP, EPO, and rear-door interlock Rack safety: EPO, rack and branch-circuit breakers, door interlock, CE and NRTL certification

Mi-BEAM safety: OV, OC, OP, OTP, and anti-islanding
Standard Service Ends Dec. 31, 2026 Ends Dec. 31, 2026 5-year warranty on Mi-BEAM
2-year warranty on rack

*Parallel racks for up to 8.6 MW, for higher power, please consult the factory.

Mi-BEAM Power Rack Configuration Guide

Mi-BEAM Power Rack Configuration Guide 

Ready to Plan Your Transition to Mi-BEAM?

Talk with our experts to determine the right Mi-BEAM configuration for your high-power testing requirements.

 

Talk to an Expert / Download PDF